FAQ
JSC "Uzmetkombinat" is the leading enterprise of ferrous metallurgy in Uzbekistan
More than 70 years JSC “Uzmetkombinat” is among the manufacturers of metal products. It began its work activity from 5th of March 1944, the start of open-hearth furnace..

In 1994, the Uzbek metallurgical plant as a result of its Association with Shirin machine-building plant and self-management of enterprises “Vtorchermet”, was transformed into an open joint stock company “Uzbek Metallurgical Plant” in accordance with the decree of the Cabinet of Ministers of the Republic of Uzbekistan “On establishment of joint stock company “Uzbek Metallurgical Plant”, dated from 24th of March 1994
The plant is the basic industry and is in close relationship with all other enterprises, therefore the development of ferrous metallurgy in the Republic of Uzbekistan is a priority national task of the current stage of economic development.
ADVANTAGES
All products of the plant have certificates of conformity, quality management systems are certified in the National and International Certification System.
BETTER EVERY DAY
The development of ferrous metallurgy in the Republic of Uzbekistan is a priority national task of the current stage of economic development.
ONE STEP AHEAD
The plant actively develops cooperative ties with other enterprises of the Republic, as well as with small businesses and private entrepreneurship,
CUSTOMER CENTRIC
The plant in its structure has:
- Steel melting shop.
- Rolling mill shop
STRUCTURE
- Production of non-ferrous metals;
- Production of thermal insulation materials;
- Production of consumer goods;
OUR COMPANY IN NUMBERS
6,4
113
According to the analysis, in the first six months of 2024, the gross domestic product increased by 6.4%, industry - 7.8%, construction - 10.1%, services - 12.9%
Budget revenues also increased by 14%, reaching 113 trillion soums.
At the moment, in order to prepare for the autumn-winter season, repair works are being carried out in the Energy department of our combine.
3 pcs
110
3 new 200 MVA, 2 90 MVA and 2 45 MVA power transformers are being installed
110 kV high-voltage overhead power lines were built between the "Metallurgiya" substation and the newly built CHKP-5 substation
For example, at present, 2 "Harakat 2000 Gg" and 2 heat exchange devices are out of repair in 4 boiler rooms of the unit.
01
The implementation of a single
- first, the implementation of a single, well-thought-out technical policy for the modernization and diversification of production, the introduction of modern energy-saving technologies and equipment, and the expansion of the raw material base of society;
02
Structural transformations
- secondly, the implementation of structural transformations in the management system of the company, aimed at ensuring high rates of production growth, increasing the volume of exports of products with high added value, including through the development of new markets, carrying out targeted work on a systematic basis to reduce the cost of production;
03
An active investment policy
The implementation of an active investment policy that provides for the implementation of major investment projects to expand the resource base, construction and commissioning of new high-tech industries, including through attracting foreign direct investment.
The objectives of Uzmetkombinat:
"Green" energy reforms
As a result of the reforms in "green" energy, 1.6 billion kilowatts of "green" energy was received in the first half of the year due to the 10 solar and wind power plants with a capacity of 2.4 gigawatts.
FAQ
CONTACT
GET IN TOUCH
Email us
info@uzmetkombinat.com
Visit us
Uzbekistan, Bekabad city, Tashkent region, Syrdarinskaya Street, 1

Call us
+998 90 123 45 67
©2024 Copyright
Made on
Tilda